01 · Signal
Signal detected
Yangtze Delta port congestion intensifies. Risk pulse moves to elevated.
SeverityHigh
A real disruption — detected, traced, simulated, and resolved. Five steps. One operating loop.
Each stage feeds the next, automatically — no spreadsheets, no war rooms.
Yangtze Delta port congestion intensifies. Risk pulse moves to elevated.
Path resolves to Qingdao Precision — a Tier-2 forge with no qualified backup.
Two inbound shipments to Barcelona predicted +6 days behind schedule.
Stress test projects coverage falls below safety stock in 6 days.
Shift 35% to Hanoi Forge backup, pre-position safety stock at LA/LB.
Disruptions reaching operations
On-time delivery
Impact mitigated per year
Book a trace review or create your workspace — first risk graph in 7 days.